MTK Surveys and Engineering Limited was contracted for OCTP pre-engineering survey for the Offshore Gas Export Pipeline. Below are just a few Jobs (time stamped) undertaken within this scope.

In July 2018 MTK Surveys and Engineering Limited was contracted to check the alignment of the Seminole vessel with the Bezemer Wench for the Shore Pulling and other Survey Works. This involved the following; Reconnaissance Survey, Near Shore Survey, Topographical Survey and Setting Out, Leveling and Monitoring Excavation works, Alignment, Daily Observation of the depth of the Pipe, Top of Pipe Survey and an As-Built Survey.

In October 2018 MTK Surveys and Engineering Limited was contracted to provide an Inspection Survey of the existing 26" Gas Pipe which pertains to the Ghana OCTP Development Project located at Sanzule, Western Region.

It included; The survey of the existing pipeline at 1m interval to assess whether it has been further buried in relation to previous measurements, A topographic survey of the beach to show spot heights at specific locations relative to the existing pipe and Determination of the height difference between the existing culvert and the immediate top of pipe elevation for burial analysis. Vertical Profile of pipeline was superimposed onto previous profile for comparative
analysis.

All survey works were executed to the satisfaction of our client and according to industry standards.